APPLY HERE
Location: Bengaluru
Company: Yokogawa
Education Qualifications
Diploma in Electronics & Communication Engineering
Work Experience
- Work experience in Production Engineering/ Quality Engineer/Panel Manufacturing.
- Should have work experience of at least 2-10 years.
Skills & Competency
- Receiving of GA/IA drawing /wiring drawing and OLC
- Identify & Allotment of project to TPA/In-house
- Issuing of GA/IA drawing /wiring drawing and OLC to TPA
- Update documents on daily basis and circulate.
- Refer Mfg. schedule for materials movement
- As Per Cabinet BOM raising WMS request for Approval & Issue.
- Request WMS for all project materials & sending materials to TPA upon approval from project. (PM)
- Request WMS for all project materials & sending materials to in-house upon approval from project. (PM)
- Shortage list Preparation for all ongoing project on weekly basis
- Check for GA/IA progress for the respective project
- Check for Internal Unit 1 & 2 Internal/Service label ordering Mfg./Project.
- Check for wiring progress for respective project.
- Check for project completion in line with the monthly schedule.
- Check for ready of TB Markers/Acrylic.
- Co-ordination with CMM/Project for shortage of materials and additional requirements.
- Supervision of wiring technician/tools and tackles usage
- Check for Consumables
- Stop authority of work @ wrong work progress.
- Ensure all activity completed & with panel inspection check sheet for QC checking in line with the Tentative schedule date for staging and JTN.
Key Responsibilities
- Issue of OLC to the respective project & on time completion.
- Inform MQA for verification of OLC through Mail.
- Follow HSE guideline in-line with CQHSE in-production floor
- Ensure 5s in shop floor
- Make production line rejection for fault modules & inform to MQA/Project (Fault analysis)
- Upon DA receipt support if any pending activity for changes in project
- Left out project materials to be store return on WBS element number (Respective project)
- Prepare one-time staging report for consolidation. /Delayed reason.
- Maintenance of Tools & Jigs
- Vendor follow-up for Panel Check Sheet
- Raising MPR for Regular Monthly & TPA Vendor Billing
- Procuring Tools & Consumables
- Punch Point Closing
- TPA Vendor Material Movement for Running Jobs
- Raising WMS for Material request
- Pre-Fat Punch Follow-up with vendor & Closing the Same
- Weekly Shortage list Preparation
- Panels & Console Count
- KANBAN Board Updation
- AVP/Panel Doors Re-Work based on requirement of project.
- Mounting plat/ Bare cabinet status
- Materials Reconciliation
Loading form…





